Countertop Contractor near Flamingo Gardens
Countertop contractor near Flamingo Gardens in Davie is a job priced off one measurement, the length of the counter run you already have. These streets sit inside a census tract that holds three unrelated kinds of housing, so any average taken across it describes nobody's kitchen. We measure yours first, and the band below carries the size it was built against.
- Warranty
- 2 years
- License
- CGC1524886

- Licensed & insured: CGC1524886
- 500+ kitchens completed
- 2-year workmanship warranty
- Answered 7 AM–10 PM, 7 days
Countertop contractor near Flamingo Gardens is one of the few jobs in a kitchen that gets priced almost straight off a single measurement: how many feet of counter you actually have. Cabinets carry a style question and backsplash carries a taste question. A counter carries a length, and the length does most of the work in the number. That is why a figure quoted for a whole town is thin help anywhere, and thinner than usual on this side of Davie. The addresses around the gardens fall inside one census tract that holds three kinds of housing with nothing in common, so an average taken across that boundary lands on no kitchen inside it. We do not start from an average. We start with a tape in your kitchen, and the band further down states the size it was drawn against.

One Census Tract, Three Different Kitchens
The tract in question is 702.05 of Broward County, and the gardens sit inside it along with these streets. It splits into three block groups, and the three are not versions of each other. The one that covers this pocket counts 600 housing units, 590 of them single family detached houses. The block group beside it counts 686 units, and 542 of those are attached townhouses. In the third, all 940 housing units are mobile homes, according to the American Community Survey five year estimates. One boundary, three housing stocks, one average that gets quoted as if it meant something.
Read that as counter length rather than as a comparison of streets, because counter length is the only part of it we are qualified to talk about. A detached house on a wide lot, a townhouse and a galley in a mobile home hold three very different runs of counter. Averaging the three produces a figure that matches none of them, and a contractor who prices off it has to be wrong in at least two directions at once.
It turns into a habit on the phone. Someone asks what a counter costs in this part of Davie, gets a rate per square foot in reply, and takes it for a quote. Then the tape comes out, and the island was never counted, or the sink was going to move and nobody said so. The correction arrives late and it arrives as bad news.
So we run it in the other order. The first visit is the measurement, taken in your kitchen against your own cabinets, and the band on this page is published with the run size it was drawn against sitting right beside it.


Why the Number Comes After the Tape Measure
A countertop replacement runs $4,500 to $7,500, and that band is built against a kitchen of around thirty linear feet. It buys the whole counter rather than a portion of it: template, fabrication, removing and hauling away what is there now, installation, the sink cutout, the edge profile you picked and the seams. Shutting the water, pulling the faucet and drain and setting the sink back afterward is inside that number too. The same structure covers the nine cities we serve, so nothing on these streets costs more for sitting this far west.
The thirty feet is a reference, not a claim about the neighborhood. Nobody publishes a typical run for the houses around the gardens and we are not going to invent one. It is the size the band was drawn against, which is what lets you place your own kitchen before the visit.
Timing splits into two figures that are worth keeping apart. Two to three weeks is the total from the day we template, because your slab is cut to your measurements rather than pulled off a rack. One to two days is the part that happens inside your house. The gap between them is deliberate: nothing comes out until the new counter is cut, polished and loaded on the truck, so the waiting week is a week you spend cooking on the counter you already have.
Two details on how the work is taken. The template goes over the cabinets as they stand, with a level run along the top, not off a drawing of what the kitchen was supposed to be. And you are told where the seam will fall before the stone is cut, because finding out after the counter is set is too late to have an opinion.

The Route from Flamingo Gardens to the Shop
From the gardens, take South Flamingo Road south to Griffin Road and head east. Griffin crosses Davie from one end of town to the other and asks for no other turn along the way, and it finishes at State Road 7. We are just north of that intersection, at 4491 South State Road 7, suite PH19. When Griffin is heavy, the other option is South Flamingo Road north to I-595 east and off at the State Road 7 exit heading south. Call before you leave and we will say which one is moving. Someone answers from 7 AM to 10 PM, seven days a week. None of that is necessary to get started. We template at your house, so the first appointment is a tape measure at your counter rather than an hour in a showroom.

Kitchen Remodeler Davie
4491 S State Road 7, Ste PH19, Davie, FL 33314
Every day, 7:00 AM – 10:00 PM
Licensed, Insured, and Permitted in Davie
Replacing a counter in Davie generally stays clear of permitting while the sink stays in its current position and no supply lines, drain or circuits are relocated. Once any of that moves, the job stops being only a countertop. The Town staffs its inspectors by trade, with structural, electrical, mechanical and plumbing scheduled separately, which is worth knowing before you agree to shift a sink a foot and a half for the sake of a layout: that decision adds a trade to your project rather than a few inches to your counter. The determination belongs to the Building Division, not to us. Requirements vary by project scope, and any required permitting, drawings, engineering or design services are identified and priced before the project is approved. The work is contracted and invoiced by Gaven Constructions under Florida license CGC1524886, and installation labor carries a two year workmanship warranty from that same company.
- License
- CGC1524886 Certified General Contractor, verifiable in the Florida DBPR licensee search.
- Insurance
- Insured and bonded Certificates are available before any work is scheduled.
- Workmanship warranty
- 2 years On installation labor. Most of this market publishes one.
- Permits and design
- Priced before approval Requirements vary by project scope. Any required permitting, drawings, engineering, or design services are identified and priced before the project is approved.
- Who contracts the work
- Gaven Constructions Kitchen Remodeler Davie was acquired by Gaven Constructions, a licensed contractor since 2015. Every estimate and invoice is issued in that name, which is what puts the license behind the job.
Common Questions
How much is a new countertop near Flamingo Gardens in Davie?
$4,500 to $7,500, drawn against a kitchen of about thirty linear feet, and the same figure applies across the nine cities we cover. It is the complete counter: template, fabrication, tear out and disposal of the old top, installation, the sink cutout, the edge profile and the seams, with the sink disconnected and reconnected inside that price. Where you sit in the spread is decided by your own run and your material, not by your address. We do not price a section of a counter to shrink the number.
Why will you not quote my Davie counter over the phone?
Because the housing on this side of town does not average well. The census tract that contains the gardens holds three block groups: one is 590 detached houses, the next is 542 townhouses, the third is 940 mobile homes. A single number covering all three describes none of them, and a counter is the part of a kitchen priced almost directly off length. Two minutes with a tape along each wall, plus the island if you have one, replaces the entire guess.
How long does a Davie countertop replacement take, and how long is my kitchen unusable?
Two to three weeks in total, counted from the day we template, and one to two days of that inside your house. The long figure is fabrication, since the slab is cut to your measurements rather than taken from stock, and you keep using your existing counter through all of it. The short figure is the part you feel, and it stays short because nothing is removed until the new counter is finished and on the truck.
Do I need a permit to replace a countertop in Davie?
It depends on the scope, and no contractor should hand you a table of which jobs need one. As a general shape, swapping the counter inside the existing footprint with the sink staying put is far less likely to need review than a job that relocates the sink, the supply lines or a circuit, because Davie inspects plumbing as its own trade with its own inspector. The determination belongs to the Building Division. What we do is identify anything your scope requires and price it in the written estimate, before the project is approved.
Where does the seam go in a new Davie countertop?
Somewhere you agreed to, and you hear it before the stone is cut rather than after it is set. A long run or a corner usually calls for a joint, and there are better and worse places to put one, generally away from the sink and out of the sight line you walk in on. On the counters we template ourselves that position is marked on the template and shown to you while it can still be changed.
Recent Kitchen Remodeling Projects in Davie
Know the feet before you know the price?
Walk each wall with a tape, add the island, and tell us the total. That single number puts you inside the band before anyone drives out to you.
Call (786) 780-2728






