(786) 780-2728 Every day, 7:00 AM – 10:00 PM FL CGC1524886 · Insured & bonded

Floor or cabinets first · Davie, FL

Does Flooring Go Before or After Kitchen Cabinets in Davie?

Does flooring go before or after kitchen cabinets in Davie depends on one thing: whether the new floor floats or is fixed down. Tile, glue-down vinyl and nailed or glued wood can go in first and run under the cabinets. A floating floor, laminate or click-together vinyl plank, goes in after the cabinets and stops at their base, because the cabinets would pin it down.

Wood floor moisture at install, most of the U.S.
8%
· USDA Wood Handbook, Table 13–2
The same floor on the damp, warm coast
11%
· same table, a zone that takes in South Florida
Does flooring go before or after kitchen cabinets in Davie: a finished kitchen with white shaker cabinets standing on a light wood plank floor, a gas range, a stainless sink under the window and the corner of a white island on the left
  • Licensed & insured: CGC1524886
  • 500+ kitchens completed
  • 2-year workmanship warranty
  • Answered 7 AM–10 PM, 7 days

Why a Floating Floor Goes In Last

A floating floor is not fastened to anything below it. In Consumer Reports' words, it attaches only to itself and not to the subfloor, so the whole surface can shift as moisture and temperature change. That movement is the design. It is what keeps the planks from buckling.

Now stand a run of base cabinets on top, loaded with dishes and a stone counter. The floor can no longer move under that weight. It still swells and shrinks everywhere else, and the strain ends up at the edge of the cabinets.

So the order flips. The cabinets stand on the subfloor, and the planks run up to them, with the gap they need hidden behind the toe kick. An island gets the same treatment: the floor goes around it, not under it.

A fixed floor is the opposite case. Tile is set in mortar, glue-down vinyl is bonded and nailed wood is fastened, so a cabinet on top pins nothing that was meant to move. Those floors can go down first, wall to wall.

The flooring's own installation instructions settle any doubt. Read them before the cabinets are ordered.

The Height Problem Nobody Plans For

Cabinets are set to the floor they stand on. The National Kitchen and Bath Association describes the standard method: the installer finds the high spot of the floor and marks 34 inches above it, and the base cabinets are leveled to that line with adjustable legs hidden behind the toe kick. The same guide warns that most floors in older homes are not level.

That line fixes everything under the counter. When the new floor goes down after the cabinets, it raises the floor in front of them by its own thickness. The counter stays put.

The dishwasher feels it first. It slides into the opening between the floor and the underside of the counter. Lay a thicker floor in front of it and that opening gets shorter, and a dishwasher that fit the day it went in can be hard to pull out for service. The range and a built-in refrigerator face the same question.

None of this needs a guess. The dishwasher's installation manual gives the opening it needs. The flooring gives its thickness. Compare the two before the boxes are set.

A finished kitchen with cream shaker cabinets, a stainless dishwasher set between two base cabinets, a stainless range under a chimney hood and a light wood plank floor

When the Floor Goes In During a Remodel

In the schedules we write, the floor is not part of the price unless the job specifies it. When it is, it goes down after demolition and the prep work, with the room empty, and the cabinets are installed on top of it. That is the order for tile and other fixed floors, and it is the reason the floor choice has to be made before the cabinets are ordered. A floating floor flips it.

Keeping the existing floor is a third case, and it is common. Tile laid around the old cabinets usually stops at their outline. If the new layout moves a cabinet, a strip with no tile can show. Moving a sink run or adding an island means checking what is under the old boxes before you commit to keeping the floor.

What Davie's Damp Air Does to a Wood Floor

Wood moves with the air around it, and South Florida air is damp. The USDA Forest Products Laboratory's Wood Handbook recommends installing interior wood flooring at about 8% moisture in most of the country, and at 11% in the damp, warm coastal zone its map draws around the Florida peninsula. It also says wood should go in at the moisture it will live at, to avoid buckling. For a wood floor in a Davie kitchen, that means the boards sit in the house before they go down, and they keep their room to move once the cabinets are set. Our office is at 4491 S State Road 7, Ste PH19, Davie, FL 33314.

A finished kitchen with honey oak raised-panel cabinets standing on a beige square tile floor, a stainless range, a sink under the window and a stainless refrigerator

The floor is one decision inside a full kitchen project, and the rest of that scope is on our kitchen remodeler page for Davie.

Watch

Floor or Cabinets in Two Minutes

Which floors go in before the cabinets and which go in after, why a floating floor cannot sit under them, and how the order changes the counter height and the dishwasher opening.

Common Questions

Should vinyl plank flooring go in before or after the cabinets in Davie?

It depends on how it is installed. Click-together vinyl plank floats, so it goes in after the cabinets and stops at the toe kick. Glue-down vinyl is bonded to the subfloor and can run under the cabinets like tile. The box usually tells you which one you bought.

Can I keep my tile floor and put new cabinets on it in Davie?

Often, yes, if the tile is sound and the new cabinets sit where the old ones did. Tile laid around the old cabinets stops at their outline, so a new layout can expose a bare strip. Check under the old boxes before you plan around the floor.

Will a new floor trap my dishwasher in Davie?

It can, if the floor goes down after the cabinets and in front of the dishwasher. The new floor takes its own thickness out of the opening under the counter. Check the dishwasher manual for the opening it needs before you pick the floor.

Recent Kitchen Remodeling Projects in Davie

  • Kitchen opened to the living room in Davie, FL, with a seated island and a run of integrated cabinets
    Kitchen opened to the living room, with a seated island Luxury kitchen remodeling
  • Galley kitchen in Davie, FL with the upper cabinets removed on one wall and a floating shelf in their place
    Galley kitchen opened up on one wall Galley kitchen remodeling
  • Finished kitchen island in Davie, FL with stools, the perimeter cabinets and the range behind it
    Island cabinetry with seating and a full perimeter run Kitchen island cabinetry
  • Refaced kitchen cabinets in Davie, FL: the sink corner with shaker fronts, an undermount sink and a tile backsplash
    Refaced cabinets, shaker fronts and a tile backsplash Cabinet refacing
  • Refinished kitchen cabinets in Davie, FL painted navy under the speckled granite that was already there
    Cabinets refinished in navy under the existing granite Cabinet refinishing
  • Custom kitchen cabinets in Davie, FL: a bank of drawers under the cooktop with a stone counter, and a full height pantry next to the refrigerator
    Drawer bank under the cooktop, pantry beside the fridge Custom kitchen cabinets
  • Accessible kitchen counter in Davie, FL run at two heights, with the lower surface left open to the floor
    Counter at two heights, open underneath Accessible kitchen remodeling
  • Kitchen layout redesign in Davie, FL seen along the walkway between the wall cabinets and the island
    A wider walkway between the wall run and the island Kitchen layout redesign
Decide the floor before the cabinets are ordered, not after they are standing. Name the material, its thickness and whether it floats or is fixed down. That one answer tells the installer where the boxes stand, how high the counter ends up and how much room the dishwasher gets.

Planning the floor and the cabinets together?

Tell us the floor you have, the one you want and whether it floats. We set the cabinet heights and the dishwasher opening around it before anything is ordered. Our office is at 4491 S State Road 7, Ste PH19, Davie, FL 33314.

Call (786) 780-2728