Does Flooring Go Before or After Kitchen Cabinets in Davie?
Does flooring go before or after kitchen cabinets in Davie depends on one thing: whether the new floor floats or is fixed down. Tile, glue-down vinyl and nailed or glued wood can go in first and run under the cabinets. A floating floor, laminate or click-together vinyl plank, goes in after the cabinets and stops at their base, because the cabinets would pin it down.
- Wood floor moisture at install, most of the U.S.
- 8%
- · USDA Wood Handbook, Table 13–2
- The same floor on the damp, warm coast
- 11%
- · same table, a zone that takes in South Florida

- Licensed & insured: CGC1524886
- 500+ kitchens completed
- 2-year workmanship warranty
- Answered 7 AM–10 PM, 7 days
Why a Floating Floor Goes In Last
A floating floor is not fastened to anything below it. In Consumer Reports' words, it attaches only to itself and not to the subfloor, so the whole surface can shift as moisture and temperature change. That movement is the design. It is what keeps the planks from buckling.
Now stand a run of base cabinets on top, loaded with dishes and a stone counter. The floor can no longer move under that weight. It still swells and shrinks everywhere else, and the strain ends up at the edge of the cabinets.
So the order flips. The cabinets stand on the subfloor, and the planks run up to them, with the gap they need hidden behind the toe kick. An island gets the same treatment: the floor goes around it, not under it.
A fixed floor is the opposite case. Tile is set in mortar, glue-down vinyl is bonded and nailed wood is fastened, so a cabinet on top pins nothing that was meant to move. Those floors can go down first, wall to wall.
The flooring's own installation instructions settle any doubt. Read them before the cabinets are ordered.
The Height Problem Nobody Plans For
Cabinets are set to the floor they stand on. The National Kitchen and Bath Association describes the standard method: the installer finds the high spot of the floor and marks 34 inches above it, and the base cabinets are leveled to that line with adjustable legs hidden behind the toe kick. The same guide warns that most floors in older homes are not level.
That line fixes everything under the counter. When the new floor goes down after the cabinets, it raises the floor in front of them by its own thickness. The counter stays put.
The dishwasher feels it first. It slides into the opening between the floor and the underside of the counter. Lay a thicker floor in front of it and that opening gets shorter, and a dishwasher that fit the day it went in can be hard to pull out for service. The range and a built-in refrigerator face the same question.
None of this needs a guess. The dishwasher's installation manual gives the opening it needs. The flooring gives its thickness. Compare the two before the boxes are set.

When the Floor Goes In During a Remodel
In the schedules we write, the floor is not part of the price unless the job specifies it. When it is, it goes down after demolition and the prep work, with the room empty, and the cabinets are installed on top of it. That is the order for tile and other fixed floors, and it is the reason the floor choice has to be made before the cabinets are ordered. A floating floor flips it.
Keeping the existing floor is a third case, and it is common. Tile laid around the old cabinets usually stops at their outline. If the new layout moves a cabinet, a strip with no tile can show. Moving a sink run or adding an island means checking what is under the old boxes before you commit to keeping the floor.