(786) 780-2728 Every day, 7:00 AM – 10:00 PM FL CGC1524886 · Insured & bonded

Quartz Countertop Installation Davie, FL

Quartz countertop installation Davie, templated on your installed cabinets and fabricated before anything comes out. Engineered, non-porous, and never sealed.

Thickness
2 cm / 3 cm
In your house
1–2 days
Warranty
2 years
License
CGC1524886
Quartz countertop installation Davie, FL: a white veined quartz run with an undermount sink in a rebuilt kitchen

Quartz is not stone that was quarried and cut. It is roughly nine parts ground quartz to one part resin, pressed and cured into a slab, and that manufacturing step is the whole reason it behaves the way it does in a South Florida kitchen: the surface has no pore structure, so there is nothing to seal and nothing for moisture to get into. Everything else on this page follows from that one fact.

Quartz countertop installation in Davie, FL: the fabricated square edge and the corner of a cooktop cutout, veining running across both

When Quartz Is the Right Counter for Your Kitchen

Quartz is the surface most Davie kitchens end up with, and it earns that four ways.

You are tired of maintaining a counter. Granite and marble are quarried stone with a pore structure, and on the slabs open enough to want a sealer that means a schedule you will forget. Quartz has no schedule. You wipe it and that is the entire maintenance program. It is not a sales claim either: Consumer Reports tested the two side by side and found them equal on cutting, heat and abrasion, with maintenance as the real difference between quartz and granite. One can need sealing and the other never does.

You cook, and you want to stop worrying about the counter. Quartz is dense enough that red wine, lemon juice, turmeric and olive oil sit on top instead of going in, which is the same property that makes it a food-contact surface rather than a splash surface.

You want a specific look and you want it to be the same on both sides of the sink. Quarried stone is whatever the quarry produced that week, and two slabs of the same granite do not match. Quartz is manufactured to a pattern, which is why a long run or an island plus a perimeter comes out looking like one kitchen instead of two.

You are staying in the house. The two-year workmanship warranty on the installation is ours; the material warranty is the manufacturer's and runs far longer than that on most series. We will show you which is which in writing rather than let you assume they are the same document.

Where quartz is the wrong call: outdoors, and directly under a west window with no overhang. The resin that makes it non-porous is also what yellows under sustained direct UV. If your counter runs into a Florida room or a summer kitchen, that section should be a different material and we will say so before you buy a slab.

A 1980s Davie kitchen with the original counter still on one run and the cabinet boxes cleared for a new quartz top A quartz run carried around an inside corner onto the second wall with the veining matched across the joint

Which Quartz Specification Is Yours

Three specifications get decided before a slab is ordered, and they move both the price and how the counter lives. None of them is about which brand is on the label.

Thickness: 2 cm or 3 cm

Three centimeter slabs run as a single thickness to the edge. Two centimeter slabs are lighter and cheaper, and the visible edge is built up with a laminated strip to read as thicker. Both are sound. The one that matters is the overhang: a 2 cm bar top past about ten inches wants support underneath, and a 3 cm does not until further out.

Finish: polished, honed or textured

Polished is what most people picture and it is the easiest to clean. Honed is flat and matte and shows fingerprints and oils more, especially in dark colors. Textured sits between them and hides day-to-day marks best. The finish is not a look-only decision, which is why it is here.

Edge profile

Eased and square are the standard and are included in every number on this page. Ogee, bullnose and mitered waterfall edges are fabrication labor and add to it. A mitered edge on an island is the one that changes a kitchen the most and costs the most, in that order.

Polished quartz in a Davie kitchen, reflecting the window light across the full run Honed quartz with a flat matte surface next to a stainless undermount sink Textured quartz catching side light across the grain on a Davie island
Polished, honed and textured: the same slab in three finishes. The finish changes maintenance more than it changes the look.

How a Quartz Countertop Installation Runs, Step by Step

  1. Measure and scope, at your house, free. We measure the run, look at the sink and cooktop you have or want, check whether the cabinets can carry a 3 cm slab, and write down what you want changed.
  2. A written number before anything is ordered. One price, itemized: material, fabrication, edge, cutouts, seams and installation. It does not move unless you approve a change in scope.
  3. Slab selection. For a solid color you pick from a sample. For anything with heavy veining you go look at the actual slab, because the pattern is not repeatable and the sample does not tell you where the veins land on your island.
  4. Templating, and it happens on the installed cabinets, not before. A digital template is taken off the real boxes once they are set and level. Countertop height, overhang and the clearances around the sink and the range follow the NKBA kitchen planning guidelines, which is also what keeps a dishwasher door from hitting an island.
  5. Fabrication in the shop. Cutouts for the sink, the cooktop and the faucet are cut on a CNC from the template. This is the step that decides seam placement, and we show you where the seams will be before anything is cut.
  6. Installation. The slab is set, leveled, seamed and sealed at the joints with a color-matched adhesive. An undermount sink is attached and supported from below.
  7. Plumbing reconnect and walkthrough. Faucet, disposal and drain go back, we run water, and we go through the whole run with you and write down anything that is not right before we ask for the last payment.

What Quartz Countertop Installation Costs in Davie

We do not publish our own price for quartz, and the reason is the same one that applies to every number on this site: a rate per square foot without a kitchen attached to it is a guess. What we can do is show you the bands this market actually publishes and tell you what each one is measuring.

RangeSeriesWhat it measures
$55 – $65 / sq ftentry-levelsolid colors, standard eased edge, installed
$70 – $90 / sq ftmid-rangewhere most Davie kitchens land, installed
$90 – $120 / sq ftpremiumthick profiles, heavy veining, mitered edges
$120 – $150+ / sq ftdesigner / specialtyrare slabs, oversized formats, custom fabrication

Those are installed figures for South Florida, which is the only kind worth quoting: a material-only price per square foot leaves out fabrication, cutouts and installation, and those are most of the job. That gap is most of the reason a rate you find online can sit far under the first row here and still be honest about what it covers. The published guides and the online calculators do not agree with each other, and none of them is wrong: each one measures a different mix of material and labor, and almost none of them says which. That is why we do not reproduce their ranges: a number without its scope attached cannot be compared to anything, least of all to a quote.

Tear-out of the existing counter, a fabricated edge profile, extra cutouts, a waterfall panel and building access are all real work, and any of them moves a job inside its band or into the next one. Which of them apply to your kitchen is what the written estimate says, after we measure.

We have installed most of what is sold here, including Silestone, Caesarstone, Cambria, MSI Q and Viatera. We are not a dealer for any of them and we do not get a better price from one than from another, which is why the recommendation you get is about your kitchen and not about our margin.

What actually moves the number

Square footage first, then the series. After that: how many seams the run needs, how many cutouts, whether the edge is standard or fabricated, and whether the slab has a pattern that has to be matched across a seam. Pattern matching is real labor and it is the line people are most surprised by.

Your zip code is not on that list. We charge the same in Davie, Weston and Fort Lauderdale.

One thing worth knowing before you compare quotes

A quote that gives you a rate per square foot and nothing else is not comparable to one that itemizes. Ask any company you are talking to what the number includes, specifically whether cutouts, the edge profile and the tear-out of the old counter are inside it or outside it. That single question sorts most of the spread between three estimates, and it costs you nothing to ask.

Why Choose Us

The counter is templated on your installed cabinets and fabricated before anything comes out, which is the operating rule behind the two numbers that matter here: two to three weeks from template to installation, and one to two days without a kitchen. It also means we are not guessing at a dimension.

You get a written number before anything is ordered, itemized down to the cutouts, and it holds. If the cabinets turn out not to be level enough to carry the slab, and in a 1980s Davie kitchen that happens, you see it, you get the cost to correct it, and you decide before we go further.

The crews work under Gaven Constructions, license CGC1524886, insured, with a two-year workmanship warranty on the installation. And someone answers this phone from 7 AM to 10 PM every day, which is the part most people end up caring about while they are collecting three estimates.

Licensed, Insured, and Permitted in Davie

A countertop swap on its own is usually the least regulated part of a kitchen: nothing structural moves, and the slab sits on cabinets that are already there. What pulls it into review is the plumbing. Disconnecting and reconnecting a sink is one thing; relocating the sink, moving a drain or changing a supply line is another, and so is any electrical that has to move for a new cooktop cutout. Replacing or relocating a regulated plumbing system is exactly what Section 105.1 of the Florida Building Code puts behind a permit application, and the determination on your particular scope belongs to the Town of Davie Building Division, not to us. We do not publish a table telling you which side of that line your job falls on, because following a contractor's table is your exposure and not ours. What we publish is when you find out: in the written estimate, priced, before you approve the project.

License
CGC1524886 Certified General Contractor, verifiable in the Florida DBPR licensee search.
Insurance
Insured and bonded Certificates are available before any work is scheduled.
Workmanship warranty
2 years On installation labor. Most of this market publishes one.
Permits and design
Priced before approval Requirements vary by project scope. Any required permitting, drawings, engineering, or design services are identified and priced before the project is approved.
Who contracts the work
Gaven Constructions Kitchen Remodeler Davie was acquired by Gaven Constructions, a licensed contractor since 2015. Every estimate and invoice is issued in that name, which is what puts the license behind the job.

Common Questions

What does quartz countertop installation cost in Davie, FL?

Installed, most Davie kitchens land between $70 and $90 per square foot, with entry-level series starting around $55, premium ones reaching $120, and designer or specialty slabs above that. Those are installed numbers, which is the only kind worth comparing: a material-only rate leaves out fabrication, cutouts and installation, and those are most of the job. The published guides and the online calculators do not agree with each other either, and the reason is the same: each measures a different mix of slab and labor and rarely says which, so their ranges are not comparable to a quote or to one another. What moves your number inside that band is square footage first, then the series, then how many seams and cutouts the run needs and whether the edge is standard or fabricated. Your zip code is not on the list: we charge the same in Davie, Weston and Fort Lauderdale. We will put a written, itemized figure in front of you before anything is ordered, and it holds unless you approve a change in scope.

What is the typical price for a 50 square foot quartz countertop in a Davie kitchen?

Fifty square feet is a normal Davie galley or L-shape, roughly twenty linear feet of counter, and at the $70 to $90 mid-range band that puts the installed counter somewhere around $3,500 to $4,500. Read that as a starting point and not a quote, because two 50-square-foot kitchens can price very differently. A single straight run with one sink cutout sits at the bottom of the band. The same fifty feet split across three walls with an inside corner, a cooktop cutout and a slab that has to be pattern-matched across a seam sits well above it, because seams and matching are labor and labor is most of the difference. An eased or square edge is included; an ogee, bullnose or mitered waterfall is fabrication time on top. The honest way to compare two estimates at this size is to ask each company whether cutouts, the edge profile and tear-out of the old counter are inside the number or outside it.

Does the quartz price at Lowe's or Home Depot include installation in Davie?

Usually not in the way people assume, and this is the single most common surprise we hear on the phone. A shelf or website price for quartz is typically the material alone, the slab or the square footage, with fabrication, templating, cutouts, edge work, tear-out of the old counter and the actual installation quoted separately, often by a third-party fabricator the retailer subcontracts to. That is not a trick; it is how the retail model works. What it means for you is that the number you saw is not comparable to an installed number from a contractor, and the gap between them is not small. It also means the person who templates your kitchen and the person who installs it may not be the same crew, and neither one holds the license on your job. We quote installed, itemized, with one company responsible from template to walkthrough.

Can you put a hot pan or a hot cup of coffee on quartz in a Davie kitchen?

A hot cup of coffee, yes, all day. A pan straight off the burner, no, and anyone who tells you otherwise is selling something. Quartz is about ninety percent ground stone, which does not care about heat, and about ten percent polymer resin, which does. Sustained contact from something in the 300 to 400 degree range can scorch the resin at the contact point, and that mark is permanent: it is not a stain you lift, it is a change in the material. The failure is often thermal shock rather than raw temperature: a very hot object landing on a cool slab can crack it. The practical rule is the one professional kitchens already follow: trivets. It is worth saying plainly because granite genuinely tolerates direct heat better, and if you are someone who moves pans straight from the range to the counter, that is a real reason to look at granite instead. We would rather tell you that before you buy a slab than warranty a scorch after.

Is quartz on the decline, and are Davie kitchens still choosing it?

You will see that question asked online, and the honest answer is that it is a design-cycle argument, not a performance one. What is cooling off is a specific look, the bright white slab with heavy gray veining that ran through the late 2010s, and what is replacing it in South Florida is warmer tones, softer veining and honed and textured finishes instead of high polish. The material itself is not going anywhere: it is still the surface most Davie kitchens we rebuild end up with, for the same reasons it always was, which are that it does not need sealing and that two pieces of the same series match. If you are worried about dating your kitchen, the fix is the selection and not the material. Pick the finish and the pattern you would still choose if nobody were watching, and skip whatever is currently on every kitchen feed. The counter will outlast the trend either way.

Does quartz ever need to be sealed in Davie's humidity?

No, and in this climate that matters more than it would somewhere dry. Granite, marble and quartzite come out of the ground with a pore structure, and on the ones open enough to want a sealer, keeping liquids out means reapplying on a schedule that depends on the stone, the sealer and how hard the kitchen gets used. Engineered quartz has no pore structure to seal, because the resin that binds the ground stone fills the space pores would occupy. There is no product to buy, no annual task, and no test where you leave a drop of water and see whether the slab darkens. Consumer Reports tested quartz against granite and found them equal on cutting, heat and abrasion, with maintenance as the real separator. In a house that runs humid nine or ten months a year, a sealed stone is a maintenance item you will forget about, and forgetting is when staining happens. What quartz still needs is what every counter needs: wipe an acid spill instead of leaving it overnight, and cut on a board.

Recent Kitchen Remodeling Projects in Davie

  • Kitchen opened to the living room in Davie, FL, with a seated island and a run of integrated cabinets
    Kitchen opened to the living room, with a seated island Luxury kitchen remodeling
  • Galley kitchen in Davie, FL with the upper cabinets removed on one wall and a floating shelf in their place
    Galley kitchen opened up on one wall Galley kitchen remodeling
  • Finished kitchen island in Davie, FL with stools, the perimeter cabinets and the range behind it
    Island cabinetry with seating and a full perimeter run Kitchen island cabinetry
  • Refaced kitchen cabinets in Davie, FL: the sink corner with shaker fronts, an undermount sink and a tile backsplash
    Refaced cabinets, shaker fronts and a tile backsplash Cabinet refacing
  • Refinished kitchen cabinets in Davie, FL painted navy under the speckled granite that was already there
    Cabinets refinished in navy under the existing granite Cabinet refinishing
  • Custom kitchen cabinets in Davie, FL: a bank of drawers under the cooktop with a stone counter, and a full height pantry next to the refrigerator
    Drawer bank under the cooktop, pantry beside the fridge Custom kitchen cabinets
  • Accessible kitchen counter in Davie, FL run at two heights, with the lower surface left open to the floor
    Counter at two heights, open underneath Accessible kitchen remodeling
  • Kitchen layout redesign in Davie, FL seen along the walkway between the wall cabinets and the island
    A wider walkway between the wall run and the island Kitchen layout redesign

Quartz is one of several surfaces we install. See how it compares against the others on the countertop contractor page, or start from what Kitchen Remodeler Davie does.

Send us the linear feet and where the sink goes.

Measure the run of counter along each wall, tell us the sink and the cooktop, and say whether you want 2 cm or 3 cm. That is enough to put you in a band before anybody schedules a template.

Call (786) 780-2728